Long-term adaptive management of common kestrel mortality

At the Candeeiros Wind Power Plant.

Partner
BE - Bioinsight & Ecoa Ambiental
Location
Candeeiros, Centre, Portugal
Timeframe
2005 - ongoing
Release of a common kestrel near the wind power plant
21years of
monitoring
Release of a common kestrel after completing all monitoring actions to ensure its protection.

The challenge

Reduce kestrel mortality while maintaining energy production.

The main challenge at the Candeeiros Wind Power Plant was to reduce common kestrel (Falco tinnunculus) mortality associated with the operation of the wind farm while maintaining energy production and minimising potential impacts on the surrounding environment and the company’s reputation.

The species’ behaviour and use of the area meant that monitoring could not be limited to recording collision mortality alone. It was also necessary to investigate movement patterns, breeding activity, habitat use and population dynamics. Given the variability of ecological processes over time, a long-term monitoring approach was considered essential.

What was done

Two decades of measures, evaluated and adjusted.

  1. 2005 - 2008

    Initial monitoring

    Ecological monitoring identified high levels of common kestrel collision mortality. A targeted conservation programme was developed in response.

  2. Mitigation

    Shrubs around the turbines

    Planting shrubs around the wind turbines made the areas immediately surrounding them less suitable for hunting, reducing exposure to collision risk.

  3. Compensation

    A hunting area elsewhere

    A separate area away from the turbines was cleared to create open habitat suitable for hunting, directing kestrel activity away from the turbines.

  4. 2021

    12 artificial nest shelters

    Installed on pine trees to increase available nesting sites. Monitoring to date has recorded no occupation (0%), so the measure has not yet resulted in documented nesting use.

The adaptive management loop

The results of the monitoring programme were used to continuously reassess the effectiveness of the measures implemented. This iterative process forms the basis of the project’s adaptive management approach.

  1. 1Monitor
  2. 2Evaluate
  3. 4Monitor again ↺
  4. 3Adapt

Methods used

Following every kestrel, not just counting collisions.

  • Common kestrel ringing
  • GPS tagging and movement monitoring
  • Nest monitoring and breeding success
  • Population monitoring
  • Collision mortality monitoring
  • Use of the plant's surroundings
  • New vegetation mosaics for hunting
  • Alternative nesting sites
Common kestrel being ringed
Common kestrel undergoing banding as part of monitoring actions to support its long-term protection.
Kestrel fitted with a GPS tag
GPS tagging and movement monitoring of common kestrel.
VHF radio-tracking antenna next to a field vehicle
VHF radio-tracking of radio-tagged common kestrels to monitor movements, habitat use and spatial behaviour.
Biometric measurement of a kestrel with callipers
Biometric measurement of a common kestrel for population monitoring.
Artificial nest box on a pine tree
Artificial nest box installed as an alternative nesting site in the surroundings of the plant.

Outcome

Evidence-based, adaptive and still producing energy.

Rather than implementing a fixed mitigation strategy, the management approach has evolved over time in response to monitoring results and the observed ecological response of the common kestrel. Mitigation and compensation measures have been reviewed and adjusted according to changes in mortality patterns, habitat use and other relevant ecological indicators.

The 21-year monitoring programme demonstrates the value of maintaining long-term environmental monitoring throughout the operational life of a wind power plant, and how conservation measures can be progressively refined to balance ecological objectives with the continued production of renewable energy.